Six Markets · One Verification Standard

Six Categories Where
Pain Meets Opportunity

We do not compete on commodity memory, consumer SSDs, or desktop CPUs. We focus exclusively on specialty semiconductors where verification matters most — and where 55-week lead times are costing manufacturers millions.

Category 01 of 06
Mature-Node MCUs
Mature-Node
Microcontrollers

The backbone of automotive, industrial, and IoT electronics. STMicroelectronics, Texas Instruments, Microchip, and Renesas MCUs are on critical allocation — 40nm+ nodes with no fab capacity relief in sight.

Market Pain
STMicroelectronics MCUs at 55-week lead times. 40nm+ nodes on critical allocation with no capacity expansion planned. Production lines stopping. Automotive OEMs paying spot premiums of 3–5x standard pricing.
SemiQor Advantage
Automotive buyers REQUIRE AEC-Q100 verification documentation. Our blockchain chain-of-custody provides immutable proof of component authenticity — solving the compliance requirement that traditional gray market distributors cannot meet. We source in 4–6 weeks. We prove it's real.
Request Quote for MCUs
Example Components SOURCING ACTIVE
STMicroelectronics STM32 Family
STM32F407VGT6
STMicro · LQFP100 · 168MHz
AVAILABLE
STM32H743ZIT6
STMicro · LQFP144 · 480MHz
AVAILABLE
STM32F103C8T6
STMicro · LQFP48 · 72MHz
55-WK ALLOC
MSP430F5529IPT
Texas Instruments · 63-pin
AVAILABLE
PIC32MX470F512H
Microchip · 64-pin · 120MHz
AVAILABLE
RL78/G14 R5F104
Renesas · 64-pin
AVAILABLE
Target Buyers
Automotive OEMs ADAS Systems EV Battery Controllers Industrial PLCs Motor Drives Smart Meters IoT Gateways HMI Systems
Lead Time (Auth.)
55 Weeks
SemiQor Delivery
4–6 Weeks
Verification
AEC-Q100
Compliance
AS6081 + BC
Category 02 of 06
Automotive Power
Automotive Power
Semiconductors

The EV revolution requires 3–5× more power semiconductors per vehicle than an ICE car. ON Semiconductor SiC MOSFETs and Infineon CoolSiC are sold out through 2026. Production delays are costing EV OEMs millions per week.

Market Pain
ON Semi SiC MOSFETs sold out through 2026. Infineon CoolSiC on 40+ week lead times. EV boom driving 3–5x more chips per vehicle. Tier 1 suppliers paying spot premiums or halting production lines entirely.
SemiQor Advantage
ISO 26262 functional safety compliance requires full traceability on every power component. Our blockchain verification provides immutable proof — critical for legal liability protection when a recall investigation starts. We source SiC in 4–6 weeks with full chain-of-custody.
Request Quote for Power
Example Components SOURCING ACTIVE
SiC MOSFETs & Power Devices
NVH060N120SC3
ON Semi SiC · 1200V · 60mΩ
AVAILABLE
IMW120R030M1H
Infineon CoolSiC · 1200V
AVAILABLE
SCT3080KL
ROHM SiC · 650V · 80mΩ
AVAILABLE
FF600R12ME4
Infineon IGBT Module · 1200V
40-WK ALLOC
UCC21750QDRQ1
TI Gate Driver · AEC-Q100
AVAILABLE
Target Buyers
Tesla Rivian Lucid Motors BYD Bosch Continental Denso EV Charging OEMs
Lead Time (Auth.)
40+ Weeks
SemiQor Delivery
4–6 Weeks
Verification
X-Ray + Elec
Compliance
ISO 26262
Category 03 of 06
Industrial Analog
Industrial
Analog ICs

Texas Instruments raised analog IC prices 15–85% in April 2026 as fab capacity was reallocated to AI and datacenter. Precision op-amps, ADCs, DACs, and voltage references are on 30–40 week lead times across the industry.

Market Pain
TI raised prices 15–85% across analog portfolio in April 2026. Fab capacity reallocated to AI/datacenter. Precision analog ICs on 30–40 week lead times. Medical device manufacturers and test equipment makers most affected.
SemiQor Advantage
Medical (FDA 21 CFR Part 11) and aerospace (AS9100) require complete verification documentation for every component in the bill of materials. We enable legally defensible gray market sourcing with documentation that satisfies auditors and regulators.
Request Quote for Analog
Example Components SOURCING ACTIVE
Precision Analog & Mixed Signal
OPA2188AIDR
Texas Instruments · Zero-Drift Op-Amp
AVAILABLE
AD7606BSTZ
Analog Devices · 16-bit 8-Ch ADC
AVAILABLE
AD9361BBCZ
Analog Devices · RF Transceiver
35-WK ALLOC
MAX6126AASA50
Maxim · Voltage Reference · 5V
AVAILABLE
LTC2057HVHS8
Linear Tech · Zero-Drift Op-Amp
AVAILABLE
Target Buyers
Medical Device Mfrs Industrial Sensors Test & Measurement Aerospace Subsystems Process Control Robotics OEMs
Lead Time (Auth.)
30–40 Weeks
SemiQor Delivery
3–5 Weeks
Verification
Electrical + Visual
Compliance
FDA 21 CFR
Category 04 of 06
High-Rel Passives
High-Reliability
Passives

Defense and aerospace programs specify military-grade tantalum capacitors, AEC-Q200 MLCCs, and high-reliability resistors with long qualification cycles that make alternatives impossible. Counterfeit risk in this category is extreme.

Market Pain
Defense/aerospace allocation. AVX military tantalum caps and Murata AEC-Q200 MLCCs on 20–35 week lead times. Long qualification cycles make drop-in alternatives impossible. Production holds on critical defense programs.
SemiQor Advantage
SemiQor is the ONLY independent distributor providing AS6081/AS6171 compliance with GIDEP/ERAI cross-referencing for high-reliability passives — making us the sole legally compliant gray market source for defense and aerospace contractors under DFARS requirements.
Request Quote for Passives
Example Components SOURCING ACTIVE
Military & Aerospace Grade Passives
TAJB226K020RNJ
AVX · Tantalum · Mil-Grade · 22µF
AVAILABLE
GRM32ER71H106K
Murata · MLCC · AEC-Q200 · 10µF
AVAILABLE
CRCW0402100RFKED
Vishay · Hi-Rel Resistor · 100Ω
AVAILABLE
A700D107M004ATE018
KEMET · Polymer Aluminum · 100µF
28-WK ALLOC
CDR31BP472BJSS
AVX · Hi-Rel MLCC · MIL-PRF-55681
AVAILABLE
Target Buyers
Aerospace Contractors Radar & Missiles Avionics OEMs Automotive Safety Medical Implants Space Systems
Lead Time (Auth.)
20–35 Weeks
SemiQor Delivery
3–5 Weeks
Verification
X-Ray + Decap
Compliance
AS6081 DFARS
Category 05 of 06
Obsolete & NRND
Obsolete &
NRND Legacy
Components

Industrial, military, and medical equipment with 10–20 year service life requires components that are no longer manufactured. You cannot redesign. Counterfeit risk in the obsolete market exceeds 70% in unverified channels.

Market Pain
Equipment with 10–20 year operational life requires parts no longer manufactured. Cannot redesign without recertification. Gray market sources carry 70%+ counterfeit risk for obsolete parts. Fake 74HC logic and MAX232 chips are rampant.
SemiQor Advantage
Obsolete parts carry the HIGHEST counterfeit risk of any category — remarked, blacktopped, and re-dated components are ubiquitous. We are the only source with blockchain-verified authenticity for end-of-life parts. Essential for safety-critical applications that cannot afford field failures.
Request Quote for Obsolete
Example Components SOURCING ACTIVE
End-of-Life & NRND Parts
SN74HC245N
TI · 74HC Logic · EOL · DIP20
AVAILABLE
MAX232CPE+
Maxim · RS-232 Transceiver · DIP16
AVAILABLE
LM7805CT
ST · Linear Regulator · TO-220
AVAILABLE
AT89C51-24PU
Atmel · 8051 MCU · DIP40 · EOL
AVAILABLE
CD4066BCN
TI · CMOS Quad Switch · NRND
AVAILABLE
Target Buyers
Industrial MRO Aerospace Repair Legacy Medical Devices Military Depot Maint. Power Grid Systems Rail & Transit
Lead Time (Auth.)
Obsolete
SemiQor Delivery
3–5 Weeks
Verification
Electrical + Visual
Compliance
70%+ Defended
Category 06 of 06
Datacenter Infra
AI Datacenter
Infrastructure

AI scaling has triggered unprecedented demand for server hardware. Baseboard Management Controllers (BMCs), PCIe switches, and high-speed transceivers are on severe allocation, creating logistics gridlocks.

Market Pain
Datacenter builds delayed. Aspeed BMCs on critical allocation. PCIe switches and Ethernet controllers on 35+ week lead times. Hyperscalers and cloud operators losing massive operational computing slots daily.
SemiQor Advantage
Datacenter infrastructure requires total hardware security assurance. Our verification labs audit silicon layers to verify that no malicious backdoor chips or compromised microcode clones enter your deployment path.
Request Quote for Datacenter
Example Components SOURCING ACTIVE
Networking & Platform Management
AST2600A3-GP
Aspeed BMC · System Controller
AVAILABLE
88E1512-A0-NNP2I000
Marvell · Gigabit PHY transceiver
AVAILABLE
PEX88096
Broadcom · PCIe Gen 4.0 Switch
38-WK ALLOC
INTEL-X550AT2
Intel · 10GbE Controller · Dual Port
AVAILABLE
M24C64-WMN6TP
STMicro · I2C EEPROM · 64Kbit
AVAILABLE
Target Buyers
Hyperscale Builders Server System ODMs Hardware Integrators Network Switch OEMs AI Compute Cluster Pools
Lead Time (Auth.)
35+ Weeks
SemiQor Delivery
4–6 Weeks
Verification
Silicon Layer Audit
Compliance
Blockchain Guard
What We Do NOT Source

We deliberately do not compete in commodity DRAM, consumer SSDs, desktop/laptop CPUs, or AI training GPUs. These markets are dominated by authorized distributor contracts with razor-thin margins and no verification requirement. We focus exclusively on specialty semiconductors where our blockchain verification model creates real, defensible value for buyers.

Can't Find
What You Need? Ask Us.

Upload your full BOM or send us a single part number. We respond in under 4 hours with availability, pricing, and verification level — across all six categories.